Systems Of Operation

Used on Layouts around Australia

Operation is an attempt to simulate prototype operations on our own layout. There are many ways to achieve this depending on the railroad, the prototype, the era modelled, and the degree of challenge the modeller wishes to accept.

The layouts listed below all have regular sessions – the links will show you the systems and paperwork used on each layout.

If you would like to include your system of operation please contact the Webmaster via the feedback form.


[display-posts category=”operations” include_title=”true” include_link=”false” include_excerpt=”true” excerpt_length=”20″]