South Australia (ANR/AN) mid 1980s
Layout Description
The layout models the main line from Adelaide, through the Adelaide Hills, to Murray Bridge and Tailem Bend. Operations are timetable-based, with minimal shunting, reflecting the limited number of suitable locations for such movements on the real main line.
Suburban trains operate between Adelaide and Mt Lofty, adding operational variety. The layout is almost fully scenicked and spans three levels, connected by both a helix and the natural gradient of the hills.
The three modelled stations are reproduced as closely to the prototype as possible, including a faithful representation of the Murray River bridge.
Convention 2025 | Event Details
Booking Details available here soon. See below for proposed opening times
Available | Maximum Capacity | |
Operating Sessions | Thursday AM | 4 |
Layout Tours | Monday AM | 6 |
Further Information
Layout Owner | Malcolm Jenkins |
Layout Location | Seven Hills |
Layout Details | Scale: N Operating System: DCC Size: 7m x 3m |
Special Instructions | Access Restricted? Yes Animals? No Wheelchair Access? No |
Additional Information | Access involves a steep slop downhill and a total of 20 steps. |